![]() ![]() The EPD should report whether the EN 15804 reference package based on EF 3.0 or EF 3.1 has been used.Ĭlarifications to the indicators and their methods may be found further down, in the Guidance on environmental performance indicators.įour GWP indicators shall be declared, both for Versions 1.0 and 2.0 of the default list of indicators. As it may take time for LCA software to update the CFs in line with the latest version of the reference package, EPDs developed using Version 2.0 may use either the old version (based on EF 3.0) or the new version (based on EF 3.1). As of this update, the CFs are based on version 3.1 of the reference package for CFs used in the PEF framework (EF 3.1), instead of the previous version (EF 3.0). The reference for the characterisation factors (CF) for Version 2.0 of the default list, the "EN 15804 reference package" provided by JRC, was updated in February 2023. However, registered EPDs using version 1.0 of the default list, or earlier versions of the default list, remain valid until their expiration dates. Version 1.0 of the default list remained valid for a transition period ending. More information about the indicators in Versions 1 and 2, respectively, can be found below. Note that the default list is for non-construction products, and that all inventory indicators of EN 15804 remain mandatory for construction products. As such, Version 2.0 entails significant changes of the impact indicators compared to Version 1.0, while the inventory indicators remain the same but some of them have become optional. Among the inventory indicators of EN 15804, the six indicators of use of primary energy are mandatory, while the remaining 11 inventory indicators are optional. This version has adopted the core environmental impact indicators of EN 15804:2012+A2:2019/AC:2021 as mandatory indicators. The latest update of the default list was made, referred to as Version 2.0. Information about such transition periods are published here. In case of updates, the previous version of the default list is valid in parallel to the new version during a transition period of at least 90 days. The default list is regularly updated based on developments in LCA methods, practices and standards, while ensuring the market stability of EPDs. An example of such a deviation is the PCR for construction products, which instead uses the list of indicators and methods in EN 15804 (see the Further information section below). Requirements or recommendations in a PCR may deviate from the default list, if such deviations have been justified in the PCR development process. This is a list of the default environmental impact and inventory indicators, and impact assessment methods, to use in EPDs of the International EPD System. Introduction to the default list of environmental performance indicators
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |